Argonne National Laboratory
RERTR
Reduced Enrichment for Research and Test Reactors
Nuclear Science and Engineering Division at Argonne
U.S. Department of Energy

Home  :: 1996 International RERTR Meeting Program  :: Related Documents

Abstracts and Available Papers Presented at the
1996 International RERTR Meeting

HANARO NUCLEAR COMMISSIONING TEST

Byung Jin Jun, Hark Rho Kim and Ji Bok Lee

HANARO Center, Korea Atomic Energy Research Institute
P.O. Box 105, Yusung, Taejon 305-600, Korea

ABSTRACT

Starting from the first fuel loading in HANARO on February 2, 1995, the reactor commissioning tests are almost finished successfully. All of the important nuclear characteristics of HANARO except rod-wise power distribution, are measured and the accuracy of design predictions are verified. It is confirmed that the reactor performs as designed and that the predictions by design tools have reasonable uncertainty for every nuclear characteristic.

The predictions for the reactivity worth of black neutron absorber and bundle-wise power distribution by neutron diffusion code deviate from the measured ones with understandable error trends. It is believed that tuning of cross sections for the absorber positions will enhance accuracy. The measurement of rod-wise power distribution and tuning of cross sections for the diffusion code are remained for further work.


PDF version NOT available
An electronic copy of the full paper is not available at this time. If you would like to receive a copy of this paper, please contact the author.


Contact:
Mr. Byung Jin Jun
HANARO Center
Korea Atomic Energy Research Institute
P.O. Box 105, Yusung, Taejon 305-600, Korea
Tel.: +82-42-868-8493

2016 RERTR Meeting

The 2016 International RERTR Meeting (RERTR-2016) will take place in Belgium. Stay tuned for further details.

2015 RERTR Meeting

The 2015 International RERTR Meeting (RERTR-2015) took place in Seoul, Korea on Oct. 11-14, 2015.
For more information visit RERTR-2015.

Links


ARGONNE NATIONAL LABORATORY, Nuclear Engineering Division, RERTR Department
9700 South Cass Ave., Argonne, IL 60439-4814
A U.S. Department of Energy laboratory managed by UChicago Argonne, LLC
 

Last modified on July 29, 2008 11:34 +0200