Abstracts and Available Papers Presented at the
2004 International RERTR Meeting
PROGRESS WITH THE AUSTRALIAN REPLACEMENT RESEARCH REACTOR
M. I. Ripley
Materials and Engineering Science
A. Irwin
Reactor Facility Commissioning
Australian Nuclear Science and Technology Organisation
PMB 1, Menai, NSW Australia
ABSTRACT
Construction of the new Australian Research Reactor, the replacement for the now 46 year old HIFAR research reactor, is approximately 80% completed. Construction of the reactor facility began in April 2002 at ANSTO’s Lucas Heights site near Sydney and commissioning is still on track for late 2005. Some details of the progress of construction and licensing and an outline of ANSTO research related to the use of Zircaloy-4 in the core region and reflector vessel of the reactor are given.
PDF version available
The full paper
is available in Adobe Systems Inc.'s Portable Document
Format (PDF) and can be read and downloaded using
Adobe's Acrobat Reader software. This software needs to
be installed on your computer either as a separate
program or as part of an Internet browser in order to
read this paper. Adobe Acrobat Reader can be downloaded
free of charge from Adobe's site on the World Wide
Web.
If Adobe's Acrobat Reader is installed on
your computer, click here
to access the full paper in PDF format.
Contact:
Dr. Jordi Roglans-Ribas
Technical Director, RERTR Department
Nuclear Engineering Division – 362
Argonne National Laboratory
9700 South Cass Avenue
Argonne, IL 60439
Fax: +1 630-252-5161
![]()


