IAEA/USA Interregional course on
Preparations to Ship Spent Nuclear Fuel (1997)
QUALITY ASSURANCE
PDF version available
DOWNLOAD full paper in PDF format.
Contact:
Mr. A. Francis DiMeglio
1207 Chalkstone Ave.
Providence, Rhode Island
Tel.: +1-401-272-4740
Fax: +1-401-354-5551
E-mail: [email protected]
IAEA/USA Interregional Training Course
Technical and Administrative Preparations Required for Shipment of Research Reactor Spent
Fuel to its Country of Origin
13-24 January 1997
Argonne, IL
MODULE 11
L.11.1
QUALITY ASSURANCE
by
A. FRANCIS DI MEGLIO
CONSULTANT
SOURCE MATERIAL
QUALITY ASSURANCE PROGRAM REQUIREMENTS FOR RESEARCH REACTORS ANSI/ANS - 15.8 1995
USA CODE OF FEDERAL REGULATIONS, SUBPART H, 10CFR71
USA ANSI/ANS NQA - 1
CODE ON THE SAFETY OF NUCLEAR POWER PLANTS: QUALITY ASSURANCE IAEA SAFETY SERIES 50-C-QA (REV. 1) 1988
GRADING OF QUALITY ASSURANCE REQUIREMENTS - A MANUAL IAEA TECHNICAL REPORTS SERIES NO. 328
SOME DEFINITIONS
QUALITY
ANS-- THE DEGREE TO WHICH AN ITEM OR PROCESS
MEETS OR EXCEEDS THE USER'S REQUIREMENTS AND
EXPECTATIONS.
IAEA-- THE TOTALITY OF FEATURES AND
CHARACTERISTICS OF AN ITEM OR SERVICE THAT
BEAR ON ITS ABILITY TO SATISFY A DEFINED
REQUIREMENT.
QUALITY ASSURANCE
ANS-- THOSE PLANNED AND SYSTEMATIC ACTIONS
NECESSARY TO PROVIDE ADEQUATE CONFIDENCE
THAT THE STRUCTURE, SYSTEM OR COMPONENT
WILL PERFORM SATISFACTORILY IN SERVICE.
IAEA-- ALL THOSE PLANNED AND SYSTEMATIC
ACTIONS NECESSARY TO PROVIDE ADEQUATE
CONFIDENCE THAT AN ITEM OR SERVICE WILL
SATISFY GIVEN REQUIREMENTS FOR QUALITY.
QUALITY CONTROL
IAEA-- THE VERIFICATION THAT THE REQUIRED
QUALITY HAS BEEN ACHIEVED.
MANAGEMENT
ANS-- THOSE PERSONS WITHIN THE RESEARCH
REACTOR ORGANIZATION WHOSE RESPONSIBILITY
AND AUTHORITY INCLUDE THE QUALITY
ASSURANCE PROGRAM.
IAEA-- THAT ASPECT OF THE OVERALL MANAGEMENT
FUNCTION THAT DETERMINES AND IMPLEMENTS
THE QUALITY POLICY.
SAFETY RELATED ITEMS
ANS-- THOSE PHYSICAL STRUCTURES, SYSTEMS, AND
COMPONENTS WHOSE INTENDED FUNCTIONS ARE TO
PREVENT ACCIDENTS THAT COULD CAUSE UNDUE
RISK TO THE HEALTH AND SAFETY OF WORKERS
AND THE PUBLIC OR TO THE RESEARCH REACTOR'S
PROGRAMS; AND TO CONTROL OR MITIGATE THE
CONSEQUENCES OF SUCH ACCIDENTS.
IAEA-- ITEMS OR SYSTEMS IMPORTANT TO SAFETY
WHICH ARE NOT SAFETY SYSTEMS.
COMPONENTS OF A QA PLAN OR PROGRAM
A NUCLEAR POWER PLANT WILL
HAVE AN INDEPENDENT QA ORGANIZATION HEADED BY A QA MANAGER WITH A STAFF.
THE MANAGER OFTEN REPORTS TO A VICE PRESIDENT THROUGH THE PLANT SUPERINTENDENT.
A RESEARCH REACTOR FACILITY
IS USUALLY OPERATED WITH A SMALL STAFF WHERE PERSONNEL PERFORM MULTIPLE
FUNCTIONS. IT IS RARELY POSSIBLE TO HAVE A TOTALLY INDEPENDENT QA ORGANIZATION
OR EVEN A QA MANAGER.
1. ORGANIZATION
SINCE SUPERVISORS (OPERATIONS, MAINTENANCE, HEALTH
PHYSICS, ENGINEERING, ETC.) ARE RESPONSIBLE FOR THE WORK OF THEIR SECTIONS
AND THEIR STAFFS, MAKE THESE SUPERVISORS RESPONSIBLE FOR THE QA PROGRAM
IN THEIR SECTIONS.
APPOINT ONE OF THEM (USUALLY AN ENGINEER) TO BE THE QA COORDINATOR. THE REACTOR MANAGER SHOULD NOT BE THE COORDINATOR BECAUSE THE MANAGER WILL AUDIT THE PROGRAM FOR ITS EFFECTIVENESS AS A MANAGEMENT TOOL.
ALTHOUGH THE COORDINATOR MAY PREPARE A DRAFT OF THE QA
PLAN, ALLOW THE SUPERVISORS TO ACTIVELY PARTICIPATE IN THE DEVELOPMENT OF
THE PLAN IN ORDER TO MAKE IT THEIR PLAN.
ALLOW THE QA COORDINATOR TO REPORT THROUGH THE REACTOR
MANAGER TO A LEVEL ABOVE THE MANAGER.
ARRANGE FOR INDIVIDUALS NOT DIRECTLY PERFORMING THE WORK
TO VERIFY THAT QUALITY HAS BEEN ACHIEVED IN THE WORK.
DEVELOP A RESPONSIBILITY MATRIX.
DEVELOP A PLAN TO RESOLVE DIFFERENCES IN OPINION BETWEEN
THE SUPERVISORS. THE REACTOR MANAGER MAY BE USED TO RESOLVE DIFFERENCES.
APPENDIX VI PRESENTS A SAMPLE QA PLAN WHICH INCORPORATES THESE ORGANIZATIONAL FEATURES.
2. QA PROGRAM
INCLUDE A STATEMENT CONCERNING THE GOALS OF THE PROGRAM.
PROGRESS TOWARDS ACHIEVING THESE GOALS SHOULD BE MEASURABLE.
IN THE PROGRAM, IDENTIFY THE ITEMS AND ACTIVITIES TO WHICH
IT APPLIES TAKING INTO ACCOUNT THE ITEM'S OR ACTIVITY'S IMPORTANCE TO SAFETY.
IF EXISTING PROCEDURES HAVE BEEN UTILIZED SATISFACTORILY,
INCORPORATE THEM INTO THE PROGRAM.
CREATE QA FORMS WHICH WILL BE USED BY THE SUPERVISORS AND
THEIR STAFFS FOR ALL WORK.
AN IMPORTANT FORM IS THE WORK PERMIT WHICH ACT AS
A REVIEW OF ALL WORK.
FOR SHIPMENT OF IRRADIATED FUEL, PREPARE FORMS FOR EACH
STEP IN THE PROCESS.
APPENDIX VI PRESENTS A REPRESENTATIVE PROGRAM AND INCLUDES SAMPLE QA FORMS AND SAMPLE FORMS FOR THE SHIPMENT OF IRRADIATED FUEL.
3. TRAINING
TRAINING IS NOT ALWAYS A SEPARATE PART OF THE PROGRAM.
IT IS SOMETIMES INCLUDED IN CHAPTER 2.
PROVIDE FOR APPROPRIATE INDOCTRINATION AND TRAINING OF
ALL INDIVIDUALS WHO PERFORM ACTIVITIES WHICH AFFECT QUALITY.
PROVIDE FOR TESTING OF TRAINED INDIVIDUALS.
PERIODICALLY MONITOR PERFORMANCE TO IDENTIFY PROGRESS TOWARDS REACHING GOALS AND TO IDENTIFY DEFICIENCIES.
VIOLATIONS OF PRACTICES SHOULD BE ADDRESSED AND DOCUMENTED, AS APPROPRIATE.
FOR INFREQUENTLY PERFORMED JOBS, PROVIDE RETRAINING BEFORE START.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON TRAINING AND INCLUDES SAMPLE QA FORMS.
4. DESIGN CONTROL
IN GENERAL, DESIGN CONTROL REFERS TO MODIFICATIONS TO A
FACILITY AND THE CONSTRUCTION NECESSARY TO ACHIEVE THE MODIFICATION.
PROVIDE FOR AN INITIAL REVIEW TO DETERMINE IFCONFIGURATION
CONTROL IS AN ISSUE.
PROVIDE FOR AN EARLY REVIEW TO DETERMINE IF THE REGULATORY
BODY MUST BE INVOLVED.
PROVIDE FOR DESIGN VERIFICATION BY REVIEW OF PLANS BY MULTIPLE
PERSONS AND COMMITTEES.
FOR SHIPMENT OF IRRADIATED FUEL, DESIGN CONTROL MAY BE
IMPORTANT FOR:
INCREASING SIZE OF DOORWAYS.
INCREASING CAPACITY FOR FLOOR LOADING.
INCREASING CAPACITY FOR OVERHEAD CRANE.
NEW HANDLING TOOLS.
MODIFICATIONS TO ASSEMBLY STORAGE RACKS.
ADDITIONAL SECURITY DEVICES.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON DESIGN CONTROL AND INCLUDES SAMPLE QA FORMS. IF EXTENSIVE DESIGN IS INVOLVED, CONSULT IAEA STANDARDS AND ANS STANDARD FOR CONSIDERATION OF ALL FACTORS.
5. PROCUREMENT CONTROL
PROVIDE FOR QA CONTROL ON ALL PURCHASE ORDERS, REQUISITIONS
AND CONTRACTS.
PROVIDE FOR VENDOR EVALUATION INCLUDING EVALUATION OF VENDOR'S
QA PROGRAM.
FOR ITEMS IMPORTANT TO SAFETY, CONSIDER INDEPENDENT VERIFICATION
OF VENDOR'S TEST RESULTS.
ESTABLISH CRITERIA FOR ACCEPTABILITY OF PRODUCTS AND PERFORM
RECEIVING INSPECTIONS IN ACCORDANCE WITH WRITTEN PROCEDURES.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON PROCUREMENT CONTROL AND INCLUDES SAMPLE QA FORMS.
6. INSTRUCTIONS, PROCEDURES AND DRAWINGS
REQUIRE THAT ALL OPERATIONS BE PERFORMED ACCORDING TO WRITTEN,
REVIEWED AND APPROVED PROCEDURES.
BASE THE EXTENT OF DETAIL IN A PROCEDURE ON THE COMPLEXITY
OF THE TASK AND ITS IMPORTANCE TO SAFETY.
DOCUMENT THE PROCESS FOR MAKING CHANGES AND REVISIONS TO
THE PROCEDURES.
PROVIDE A MECHANISM FOR CONTROL OF PROCEDURES SO THAT ONLY
CURRENT, COMPLETE VERSION IS USED.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON PROCEDURES
AND INCLUDES SAMPLE QA FORMS.
APPENDIX VII PRESENTS REPRESENTATIVE PROCEDURES FOR THE PROCESS OF RETURN OF IRRADIATED FUEL TO THE US.
7. DOCUMENT CONTROL
THE QA PLAN SHOULD DESCRIBE THE PROCESS FOR THE PREPARATION,
REVIEW AND APPROVAL OF ALL DOCUMENTS.
THE QA COORDINATOR SHOULD ESTABLISH A MASTER LIST WITH
THE CURRENT REVISION NUMBER FOR ALL DOCUMENTS WHICH ARE CONTROLLED. THESE
ARE PROCEDURES, DRAWINGS, LICENSES, CERTIFICATES, ETC.
THE SUPERVISORS SHOULD BE ASSIGNED RESPONSIBILITY FOR ALL
DOCUMENTS IN THEIR SPHERE OF RESPONSIBILITY. THE SUPERVISORS SHALL CONTROL
THE DISTRIBUTION OF DOCUMENTS IN THEIR SECTIONS.
THE QA PLAN SHALL DESCRIBE THE PROCESS USED TO MAKE MAJOR
CHANGES IN DOCUMENTS.
QA DOCUMENTATION FOR THE AS-BUILT FACILITY (INCLUDING FUEL
ASSEMBLIES) MAY NOT MEET THE REQUIREMENTS OF THE QA PLAN DEVELOPED. HOWEVER,
ALL AVAILABLE AS BUILT RECORDS SHOULD BE COLLECTED AND STORED ACCORDING
TO THE REQUIREMENTS OF THE QA PLAN.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON DOCUMENT CONTROL AND INCLUDES SAMPLE QA FORMS.
8. CONTROL OF ITEMS
CONTROL OF ITEMS IS SOMETIMES CALLED MATERIAL CONTROL.
SAFETY RELATED PARTS, COMPONENTS OR ASSEMBLIES ARE CONTROLLED BY A "MATERIAL
TAGGING PROGRAM".
THE APPLICATION AND REMOVAL OF TAGS, LABELS AND MARKINGS SHOULD BE CONTROLLED
BY THE QA COORDINATOR.
QA FORMS SHOULD BE DEVELOPED FOR USE WITH THE TAGGING PROGRAM.
THE TAG FOR ITEMS WITH SPECIFIC SHELF LIFE SHALL STATE
AN EXPIRATION DATE FOR THE ITEM.
THE CONTROL OF ITEMS SHOULD EXTEND TO HANDLING, STORAGE,
SHIPPING AND MAINTENANCE.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON ITEM CONTROL
AND INCLUDES SAMPLE QA FORMS.
9. CONTROL OF SPECIAL PROCESSES
A SPECIAL PROCESS IS ONE IN WHICH THE RESULTS ARE HIGHLY
DEPENDENT ON THE CONTROL OF THE PROCESS OR THE SKILL OF THE PERSONNEL.
DO NOT BASE THE QA PLAN ON THE MOST DIFFICULT SPECIAL PROCESS
AT THE FACILITY.
A SPECIAL PROCESS MAY BE PLACED IN AN APPENDIX TO THE QA
PLAN IN ORDER TO INCORPORATE REQUIREMENTS BEYOND THE NORMAL QA PLAN.
THE PREPARATION FOR AND THE SHIPMENT OF IRRADIATED
FUEL ASSEMBLIES IS A SPECIAL PROCESS.
CONSULTANTS ARE VERY OFTEN USED IN A SPECIAL PROCESS. THEIR
RECOMMENDATIONS SHALL BECOME PART OF THE QA FILE. RESPONSIBILITY FOR ACCEPTANCE
AND USE OF CONSULTANTS RECOMMENDATIONS RESTS WITH FACILITY STAFF.
ALTHOUGH THE SUPERVISORS PERFORM AS BEFORE, THE QA COORDINATOR
AND/OR THE REACTOR MANAGER MAY BECOME MORE INVOLVED IN A SPECIAL PROCESS.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON SPECIAL PROCESS CONTROL AND INCLUDES SAMPLE QA FORMS. "APPENDIX G AND SECTION 11" IN APPENDIX VI ARE SPECIFIC TO FUEL ASSEMBLY SHIPMENTS.
10. INSPECTIONS AND TESTING
INCLUDES EXAMINATIONS, MEASUREMENTS AND TESTS.
WRITTEN INSPECTION AND TEST PROCEDURES WHICH INCLUDE ACCEPTANCE
CRITERIA SHOULD BE USED.
INSPECTION PERSONNEL SHALL BE INDEPENDENT OF THE INDIVIDUALS
PERFORMING THE ACTIVITY BEING INSPECTED.
INSPECTIONS AND TESTS WHICH FAIL SHALL BE REPORTED ON A
"DISCREPANCY AND NONCONFORMANCE SHEET" WHICH BECOMES PART OF THE
QA RECORD.
MEASURING AND TEST EQUIPMENT SHALL BE CONTROLLED AND CALIBRATED
AT SPECIFIC INTERVALS.
WHEN MEASURING AND TEST EQUIPMENT IS FOUND TO BE OUT OF CALIBRATION, A DOCUMENTED REVIEW SHALL BE MADE TO DETERMINE THE VALIDITY OF PREVIOUS USES OF THE EQUIPMENT.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON INSPECTION AND TESTING AND INCLUDES SAMPLE QA FORMS.
11. NONCONFORMANCE CONTROL
ALL NONCONFORMING ITEMS IMPORTANT TO SAFETY SHALL BE IDENTIFIED
AND TAGGED AS NONCONFORMING.
NONCONFORMING ITEMS SHOULD BE SEGREGATED.
SUCH ITEMS SHOULD BE REPAIRED OR DISPOSED OF.
REPAIRED ITEMS SHOULD BE SUBJECTED TO THE QA PROGRAM THE
SAME AS A NEWLY PURCHASED ITEM.
NONCONFORMANCE MAY REQUIRE NOTIFICATIONS TO THE VENDOR, REGULATORY BODY, ETC.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON NONCONFORMANCE AND INCLUDES SAMPLE QA FORMS.
12. QA RECORDS
THE QA PROGRAM IS BASED UPON DOCUMENTED EVIDENCE THAT ALL
ACTIVITIES HAVE BEEN PERFORMED WHICH AFFECT THE QUALITY OF SAFETY RELATED
ITEMS.
DEVELOP A MATRIX WHICH SHOWS THE RECORDS WHICH MUST BE
GENERATED, THE RETENTION PERIOD AND THE INDIVIDUAL RESPONSIBLE FOR THE RECORD.
RECORDS SHALL BE IDENTIFIABLE, EASILY RETRIEVABLE AND ARCHIVED.
THE RECORDS GENERATED DURING THE SHIPPING PROCESS (A SPECIAL PROCESS) SHALL BE MAINTAINED AS A PACKAGE.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON RECORDS AND INCLUDES SAMPLE QA FORMS. "APPENDIX G AND SECTION 11" IN APPENDIX VI ARE SPECIFIC TO FUEL ASSEMBLY SHIPMENTS.
13. QA AUDITS
PROVIDE FOR PERIODIC AUDITS OF PROGRAM.
CAREFULLY DEFINE THE SCOPE OF THE AUDIT.
AUDIT USING WRITTEN PROCEDURES AND CHECKLISTS.
FOR SELDOM USED PORTIONS OF THE PROGRAM (SPECIAL PROCESSES),
AUDIT BEFORE USE.
DEVELOP PERFORMANCE INDICATORS FOR USE DURING THE AUDIT.
CONDITIONS REQUIRING CORRECTIVE ACTIONS SHALL BE PROMPTLY REPORTED TO THE APPROPRIATE MANAGEMENT.
APPENDIX VI PRESENTS A REPRESENTATIVE SECTION ON AUDITS AND INCLUDES SAMPLE QA FORMS.